Soot will build up on the heat transfer surface when the boiler is used for a long time, influencing on boiler's efficiency since less convection heat is transferred to water. Cleaning the soot on the surface is necessary to improve the boiler efficiency.
Can customize the cleaning equipment according to the different pin tube size, to meet different ship's requirement.
|
Distributor
10kg/pcs with six valve
Hose
3kg/pcs, 5m each
Rubber Washer
6kg/pcs
|
How to use
Install the rubber washer in the pin tube, open the valve and let the freshwater into the smoke tubes.
The light soot contamination will be loosen by the compressed air in the water after a few minutes. It maybe necessary to add chemicals to water if the contamination is thick.
Keep the cleaning water replenished during cleaning, and inject freshwater for flushing. All the pin tube elements can be cleaned at the same time.
|